This project consisted of the full demolition of an existing 20,000 SF space, converting the 2nd floor into a secure space compliant with ICD 705 and tempest standards including 6-sided RF Shielding. The installation included a new electrical room with filtered power, separation of hi and low side cabling, new pantries, restrooms, and huddle rooms.