Reston Temp. Fire Station

Description:

This temporary Fire Station is compromised of a modular building for living and office spaces and a membrane-over-steel structure for the apparatus bay. The temporary facility is a total of 8,424 SF comprised of approximately 5,558 SF for the apparatus bay and 2,866 SF for the living/operations portion of the facility. The trailers and membrane-covered steel structure are to be provided by and installed by Patner construction, Inc to meet the specified 8,424 SF. A total of 18 parking spaces will be provided to the users of the temporary facility.

Details:

  • Location: Reston, VA
  • Duration: Currently under Construction
  • Size: 20,042 Square Feet
  • Special Equipment: None at this time
  • Architect: LeMay Erickson Wilcox Architects